The challenge
We worked with Hitachi Ventura on a project for Salford Royal NHS Foundation Trust Hospital (SRFT). We were commissioned to assist in the first phase of the creation of a ‘Digital Control Centre’ – a digital tool to help transform the hospital’s operations and ‘improve care with data’.
The solution
In order to help build this system, our consultants carried out video workshops to aid in the creation of complex wireframes. Simultaneously, a full UI audit took place, reviewing the current design inventory and identifying which new assets had to be created. Once completed, a Design System was made, making sure accessibility was of paramount importance.
Video Workshops
As this project was complex and required detailed knowledge, video workshops were held with both hospital staff and business analysts to gather the necessary information needed to create the wireframes.
UI Design
The design system was created to ensure all colours, icons and fonts met W3 WCAG standards and that all designs would be clear and legible on both small desktop screens and fifty-inch TV screens in the wards.